Call Now
Website
Call
Business Details
44 Years
experience
Trusted Manhole Rehabilitation Services in Steger, IL
Kim Construction has been a trusted leader in manhole rehabilitation since 1982, specializing in solving infiltration and inflow problems for public sector clients. Our expertise spans decades, with a proven track record of rehabilitating over 75,000 manhole structures across the Midwest and Southwest United States. As a certified Womens Business Enterprise (WBE), we combine technical excellence with a commitment to quality, utilizing advanced trenchless techniques and state-of-the-art equipment. Our teams deep industry knowledge ensures tailored solutions for local governments, water districts, and industries. With a focus on safety and innovation, we maintain an excellent OSHA rating and offer comprehensive services including chemical grouting, epoxy lining, and manhole frame replacements.

Backed by 38 years of experience and a ten-million-dollar bonding capacity, we deliver reliable, code-compliant results. Our fully insured operations are supported by specialized crews trained in the latest rehabilitation methodologies. From project planning to execution, we prioritize client satisfaction and long-term infrastructure integrity. Our service footprint covers 12 states, addressing diverse challenges in sanitary sewer systems. Kim Construction remains dedicated to advancing industry standards while providing cost-effective, sustainable solutions for critical infrastructure needs.
Services
Manhole Rehabilitation Chemical Grouting Epoxy Lining Frame Adjustments Chimney Seals Cement Lining Bench Repair Step Removal Pipe Rehabilitation Root Removal
Details
  • Year established: 1982
Highlights and features
  • We have 38 years of specialized experience in manhole rehabilitation.
  • Our team uses advanced trenchless techniques for minimal disruption.
  • We operate in 12 states across the Midwest and Southwest U.S.
  • We maintain an excellent safety record and OSHA compliance rating.
  • Our ten-million-dollar bonding capacity supports large-scale projects.
Associations and certifications
  • Womens Business Enterprise (WBE)
  • Strong-Seal Certified Applicator
  • Raven Epoxy Certified Applicator
Services
Manhole Rehabilitation
Specialized manhole rehabilitation services address infiltration and inflow issues using trenchless technology. Our solutions enhance structural integrity while minimizing environmental impact. Public sector clients benefit from durable upgrades to aging sewer systems.
Chemical Grouting
Precision chemical grouting seals leaks in manhole structures, preventing groundwater intrusion. This method extends infrastructure lifespan and reduces maintenance costs for municipal wastewater systems.
Epoxy Lining
High-strength epoxy lining creates corrosion-resistant barriers in manholes. This trenchless solution restores structural integrity without excavation, ensuring long-term performance in harsh environments.
Frame Adjustments
Professional frame and grade adjustments ensure proper manhole alignment and surface compatibility. This service improves safety and functionality for roadway and pedestrian areas.
Root Removal
Advanced root and mineral deposit removal prevents sewer blockages. Our non-invasive techniques clear obstructions while preserving pipeline integrity for uninterrupted system operation.
Questions
What areas do you serve for manhole rehabilitation?
We operate across the Midwest and Southwest U.S., including Illinois, Wisconsin, Iowa, Indiana, Kansas, Michigan, Missouri, Texas, Oklahoma, Arkansas, Ohio, and Minnesota.
What trenchless methods do you use?
Our techniques include chemical grouting, epoxy lining, cement coating, and advanced root removal systems to address infiltration without excavation.
Are you certified for specialized applications?
Yes, we are a certified Strong-Seal Applicator since 1991 and Raven Epoxy Certified Applicator since 1998, ensuring quality workmanship.
How experienced is your team?
With 38 years of experience since 1982, we've completed over 75,000 manhole rehabilitations and 140,000 linear feet of cement lining projects.
What equipment do you utilize?
We maintain three cement lining trucks, six grouting rigs, and three epoxy lining systems for comprehensive rehabilitation capabilities.
Do you handle large-scale municipal projects?
Our ten-million-dollar bonding capacity supports complex infrastructure upgrades for public sector clients of all sizes.