Our team of in house crew members as well as external sub contractors help with a variety of demolition and construction needs. J.I.L. Design Group, Inc. will assist with all projects, big or small. We place great emphasis on extraordinary design and development both characteristic of our clients wants and needs. Our professional and knowledgeable staff assist in all steps of the designing, building and remodeling phases. We wanted to take a moment to let you know how much we enjoy the office you built for our home.

Our team of in house crew members as well as external sub contractors help with a variety of demolition and construction needs. All inclusive of a skilled project manager to help schedule and coordinate, ensuring the remodel moves along smoothly. J.I.L. can assist with but is not limited too; Additions Single Room Remodeling Full House.

The J.I.L. team includes a group of diverse, educated and detail-oriented professionals who work together and are committed to delivering quality service and performance. With a thorough understanding of the design process, we oversee and work with our in house crew from the beginning to end of your project. We pledge to follow through until every detail is complete and you are satisfied. Irit Winston established her design firm in 1983. She is a graduate of UC Davis with a BS in Design. Irit is also a professional member of the American Society of Interior Designers (ASID), National Kitchen and Bath Association (NKBA), and the National Association of the Remodeling Industry (NARI).

What's new?

Crisp and lean. Those are the words I would use to describe the feel of this completed shower. We actually finished the project two weeks ago, but did not post until now.

Posted on Oct 09, 2020  •  Facebook

Almost done.all construction and finishes are done. We are now waiting to install doors, mirror grub bars and accessories. You can start to see the bathroom as it will look when completed.

Posted on Sep 04, 2020  •  Facebook

We are at the "Pretty " phase of the construction. Cabinets are set in place, countertop has been templated and is being fabricated, and tile work has started. The guys are on day four of installation. Shower walls are done and the floor installation has begun. There will be two more days of tile.

Posted on Aug 17, 2020  •  Facebook

Framing, insulation, dry wall, tape and texture: all done!

Posted on Jul 29, 2020  •  Facebook

Yesterday we had our fist inspection for this bathroom remodel. This inspection was for the plumbing only. Since we are creating a curbless shower pan, we needed to frame the pan to a lower level of the floor, create a slope and drain, and plumb for it. It is done and inspected.

Posted on Jul 21, 2020  •  Facebook

Similar Businesses

Glass West
West Sacramento CA (1.9 mi)
(3)
Lloyds Construction
Carmichael CA (9.3 mi)
Bradley Builders
Carmichael CA (9.3 mi)
(2)
M Bruce Ottolini & Associates
Rancho Cordova CA (10.4 mi)
GVD Renovations
Antelope CA (12.5 mi)
My House Renovation
Rancho Cordova CA (12.6 mi)
Vintage Iron
Rancho Cordova CA (12.6 mi)
Cook Engineering
Rancho Cordova CA (12.7 mi)