Our Sponge Abrasive Decontamination process is a unique, dust-free way to efficiently reduce contamination levels and dose rates in piping and components of Nuclear Power Plants. The system was designed and built specifically for the purpose of performing pipe end decontamination during Steam Generator Replacements where minimizing worker dose and project schedule are key success metrics. Our technology has since been modified to meet a variety of decontamination needs. The PED (pipe-end decon) process consists of five key components: media blast head, media feed unit, sponge abrasive media, a digital control system, and the seal dams and media recovery system (HEPA vacuum and cyclone separator).
Our waste management capabilities include the design, demonstration, installation, commissioning, and operation of waste management systems for the mixing, sampling, and pumping of radioactive waste, with a focus on maintenance-free systems that reduce costs while ensuring the safety of workers and eliminating project downtime. We also provide remote manipulator systems used for nuclear material handling, decontamination, and decommissioning. NuVision Engineering has assisted with the cleanup of legacy waste in North America and the United Kingdom for more than 30 years.
The entire industry needs more qualified candidates! https://t.co/WHMgWN0cb1
We recently completed the FAT for a H1000 Manipulator project with no open issues. Congratulations to everyone invo… https://t.co/3j6r9ZOUvu
Our Fourth Generation PED System - Model 5160 has reached another milestone on the road to use in France. The Pipe-End Decontamination system successfully passed internal Factory Acceptance Tests and external EMC testing, while meeting conformity requirements for use in the European Union. Up next:.
@YouTube there is a channel with our company name and old logo - but we don't know who set it up. How can we find o… https://t.co/JGFkXFqnvw
We've had a makeover! Checkout our new look at our new home on the web: http:// nuvisionengineer ing.com
@AskLyft are scheduled rides available in Pittsburgh, PA yet?
End of an era for reprocessing at @SellafieldLtd with the closure of THORP. 24 years of successful operations handl… https://t.co/5MNFZJAmdo
Field Team and equipment arrived at Hanbit Plant in Korea last week and completed on-site training for decontaminat… https://t.co/oQ0yciChzu
Solving the long-term waste storage issue remains a top priority for the nuclear industry. https://t.co/fuu1BM8QYU #storage #waste #nuclear
Congratulations to our longtime partner @WECNuclear ! This is the second in a series of successful project completi… https://t.co/3MgigXWkZK